STILLFORMConstruction & Development

Built to stand.Planned to last.

Commercial, civic and residential construction, planned in detail and handed over complete.

IThe site

Survey line to finished frame.

Planning

Costed and sequenced before ground is broken.

You see the programme and the budget line by line, with the risks named, before you commit a single payment.

Execution

One site team, first pour to topping out.

The people who planned it build it. Progress is measured against the programme every week, not estimated at the end of the month.

Handover

Tested, snagged and documented before the keys move.

As-built drawings, O&M manuals, certificates and warranties arrive together, in one place, on the day you take the building.

PlanBuildHand over
Fig. 1 · Concept visualisation, generated footage
Concept image: a six-storey civic building with an exposed board-formed concrete frame, lit from within at blue hour.
II · The project

Northgate Civic Hall.

Concept image Replace with the client's own completed project.

IIICase study · sample content

A civic hall on a live town-centre site.

Location
Town centre, bounded on three sides
Scope
Six-storey concrete frame, full fit-out, public realm
Role
Main contractor, design and build
Timeline
22 months on site
Outcome
Handed over on the contracted date
Concept image: the concrete frame mid-construction, three slabs complete, formwork on the upper deck.
Fig. 3 · Month nine, frame at level three. Concept image.

The challenge

A public building that had to open on a fixed civic date, on a plot with a market on one side, a bus interchange on another and homes on the third.

The constraints

  • No crane oversailing the interchange at peak hours
  • Deliveries limited to two windows a day
  • Board-marked concrete left exposed, so every pour was a finish
Concept image: close detail where a board-formed concrete column meets a slab edge and a bronze window frame.
Fig. 4 · Column to slab junction. Concept image.

The approach

We built a full-size sample panel before the first pour and agreed it with the architect as the standard for the whole frame. The programme was sequenced around the delivery windows, with a jump-form core that let the crane stay short of the interchange.

The result

A frame that needed no remedial finishing, a public realm opened with the building, and a handover pack the client's facilities team used from the first day.

What are you building?

Mark it and it goes on your project sheet. Nothing is sent.

IVSelected work · sample content

Four more, each with its facts.

Every project opens to the same sheet: where it is, what we did, how long it took and what the client got. Replace these with the firm's own.

Where is your project now?

Honest answers help. Early is fine.

Project sheet · sample content

Eastfield Logistics Hub

Location
Edge-of-town business park
Scope
Steel portal frame warehouse, 12 dock levellers, yard and drainage
Role
Design and build contractor
Timeline
14 months, groundworks to handover
Outcome
Racking contractor on site two weeks ahead of the agreed date
Project sheet · sample content

Alder Row

Location
Residential street, conservation area
Scope
Four terraced homes, brick and timber, landscaping
Role
Main contractor for a private developer
Timeline
11 months
Outcome
All four homes sold before completion, zero defects outstanding at handover
Project sheet · sample content

Level 9, Harbour House

Location
Occupied city-centre office building
Scope
Cat A to Cat B fit-out, reception, meeting suites, services
Role
Fit-out contractor
Timeline
16 weeks, noisy works out of hours
Outcome
Tenant moved in on the planned weekend, no complaints from floors above or below
Project sheet · sample content

Brookside School Extension

Location
Operating primary school
Scope
Four classrooms, covered colonnade, hard play area
Role
Main contractor for the local authority
Timeline
9 months, built during term time
Outcome
Classrooms in use for the first day of the autumn term
Concept image: a project lead in a white hard hat and hi-vis vest holding rolled drawings on site.
Sample team · concept portrait
VThe people

You get one name, and they stay.

Your project lead runs the job from first meeting to final account. You will not be handed to someone new once the contract is signed.

On site

A week on a STILLFORM site runs to the same rhythm, so problems surface on a Monday, not at month end.

MONLook-ahead with every trade
TUEQuality walk against the drawings
WEDDesign and change log reviewed
THUSafety inspection, findings closed
FRIYour written update

Safety

Daily briefings before work starts, permits for every high-risk task, and a site manager with authority to stop any job. Near misses are reported and reviewed, not hidden.

Quality

Every finish is agreed against a sample before it is built at scale. Inspections are photographed and filed against the drawing they check, so the record is there when you need it.

Your updates

Every Friday: progress against programme, cost position, photographs and the decisions we need from you. A walk-round with your lead every month.

What worries you most?
VIEnquiry

Tell us what you're building.

Four questions. Anything you marked on the way down is already filled in. A project lead replies within two working days.

Demo form. Nothing is sent.